Week 8, after the possible CORONA infection of last week, Edi is up and running again! It took about a week to recover. We will make a CORONA ANTIBODY check within the next weeks. Meanwhile it is time for an update on the camper.
|
Massive recovery point to be installed @ the front end of the camper. |
As the SPRINTER 4x4 does not have recovery points at the front or the back, we were looking for a proper solution. The crucial question is where to place the recovery point because of the massive forces needed to be taken in case of recovery.
|
Tools needed today ... |
|
Starting to remove the grill .... |
|
Removing the bumper at the front end to accses the winch. |
|
Disconnecting the winch electrics, which will make some troubles at the reassembling ... |
|
Massive winch steel support, where the recovery points should find a place. |
|
This is the place (on both sides) where recovery points should be screwed down. |
|
20 millimeter drill bit |
|
Lets start drilling, starting with 8 millimeter. |
x
|
Finished 20 millimeter hole. |
|
Perfect fit! |
|
Finished mounting using the 32 nut. |
|
Advantage of the recovery point we use is, that is it is free to rotate. |
|
Finished, left and right! |
|
At least, the connector of the winch electrics needs to be replaced .... |
|
The result, after reassambling, just like I designed it. |